



- Alki
- Admiral & North Admiral
- The Alaska Junction
- Fauntleroy
- Arbor Heights
- Gatewood
- Morgan Junction
- Highland Park
- Delridge
- Genesee Hill



What Seattle Shower Glass Work Can Include
The right glass depends on the finished opening you have — not a catalog size. We measure after the wet zone is built, and we explain any change before extra work moves.
Frameless Fixed Panel
Channel, panel, and seals matched to a finished curb or curbless edge — after the membrane is proven.
Pivot or Hinge Door
Door, hardware, strike, and clearance for the walk-in or dual-head layout you chose.
Tub Door When the Tub Stays
When the tub stays, the door still has to meet a waterproof edge and a surround that can take water daily.
Return Panels Where the Room Forces It
Only when the footprint needs it — we do not invent geometry for a catalog photo.
Tile or Microcement Surround Coordination
Same wet-zone rules either finish. Glass comes last, after tile or microcement.
Wet-Room Hardware and Seals
Hardware and seals suited to daily Seattle showers — wet-room hardware, not interior door leftovers.
Glass on a System, Not Glass Instead of a System
Stopping water is still the job. Glass is the clear wall that lets you see we did it — not a substitute for a pan and membrane.
Waterproofing Before Glass
Custom pan, continuous membrane, flood test where the scope calls for it — then glass.
Layout Before Door Swing
Dual heads, niches, and benches steal clearance. Layout first, glass second.
Finish Choice — Tile or Microcement
Grout-free microcement or tile surround — either way the edge under the channel has to be true and waterproof.
From “We Need Glass” to a Written Scope

Walk the Cost Explorer
Send photos of the bathroom opening. Walk cost explorer, then start — a real person replies within one business day.
Start a Project
Walk the cost explorer for Seattle bands — no email required. Then start. A real person replies within one business day.
Approve the Written Scope
We measure the finished opening, or we tell you what has to be built before measuring makes sense. Request → Review → Revamp.
"The Bathroom I Wanted"
"I used DuetRight to renovate my bathroom. As expected, they did an amazing job and were able to work with me to design the bathroom I wanted. Super happy and I look forward to working with them again. Thank you guys!"

SatyaJit P.
"Whole Process Stress-Free!"
"The DuetRight team did an incredible job remodeling the single bathroom in my condo, working with me every step of the way designing, picking out materials, purchasing, and coordinating. They were very communicative and organized making the whole process stress-free!"

Tom S.
"Solved the Issue"
"DuetRight helped us to re-tile our shower after we discovered a rotten backboard causing the previous tiles to fall off. The team efficiently solved the issue, leaving us with a beautifully tiled, durable shower."

Taylor H.

Angelo Russoniello

Stan Miron

Vladimir Moroz

Serhii Potavov

Austin Thomas
FAQs
More questions? Don't be shy. Give us a call!
Glass does not waterproof the shower. If you already have a stain or soft wall, start with shower leak diagnosis. If you are renovating and the wet zone is being built correctly, this page is how custom shower glass fits after tile or microcement.
Finish-only work often does not; changing plumbing, structure, or a shower configuration often does. We tell you which one you have before you commit, and we file through SDCI and Public Health–Seattle & King County when a permit applies. Budget $500–$1,500 for permit costs when they do. See the Seattle bathroom permit guide.
The glass still needs a true edge and a waterproof system underneath. Microcement changes the surround finish, not the rule that glass comes last. Price follows the opening you have — walk the cost explorer, then start for a quote.





